❌

Normal view

There are new articles available, click to refresh the page.
Before yesterdayMain stream

Stoke Space lines up $150M Pentagon loan for a second launch pad in Florida

26 October 2026 at 18:13
Stoke Space’s existing Cape Canaveral launch site in Florida. (Stoke Space Photo)

Kent, Wash.-based Stoke Space has secured a conditional commitment for a $150 million loan from the Department of War’s Office of Strategic Capital to build a second launch pad at Cape Canaveral for a larger version of its fully reusable rocket.

The loan isn’t final until Stoke meets a list of financial, legal, technical and due-diligence requirements. The announcement Monday comes less than two months after Stoke raised roughly $1 billion in a Series E round, bringing its total funding to about $2.3 billion.

The new pad would serve Stoke’s Nova Block 2 rocket, which is designed to carry up to 15 metric tons to low Earth orbit. That’s five times the capacity of Nova Pathfinder, which Stoke plans to launch for the first time from its existing pad in early 2027. Block 2 is slated to debut in 2029.

The loan would be paired with private capital to pay for the pad, according to the Department of War. Jordan Sebold, senior managing director for investments at the Office of Strategic Capital, said in a statement that adding launch infrastructure would β€œenhance the overall capacity and resilience of the commercial space industrial base.”

The Office of Strategic Capital was set up in 2022 to draw private investment into technologies seen as critical to national security. The following year, Congress gave it the power to make loans and loan guarantees to companies in those fields. Space launch is one of the technology categories it targets.

β€œBy expanding domestic launch facility capacity, this investment enables launch service providers to ensure our commercial and defense partners have reliable, high-cadence access to space,” David Lorch, the office’s director, said in the news release.

Stoke is already lined up for military launch work. In 2025, the Space Force added the company to a pool of providers that can compete for national security missions under Lane 1 of the program’s third phase. Lane 1 is the tier meant for newer launch companies and less demanding payloads. Stoke can’t bid on those missions until it completes a successful orbital flight.

The company has other federal ties as well. The Defense Innovation Unit awarded Stoke a $4.5 million contract in 2024 to study rapid delivery of cargo to orbit, and possibly back to Earth. In June, Stoke was one of 37 companies NASA chose for unfunded partnerships. Stoke’s project focuses on returning Nova’s upper stage safely through the atmosphere.


Nova is designed so both of its stages can return and fly again. The booster flies itself back for recovery. The upper stage uses a metal heat shield cooled by liquid hydrogen that circulates through channels inside it, to survive the heat of reentry. Only SpaceX, with its much larger Starship, is pursuing the same goal, and it hasn’t fully achieved it yet. Stoke has yet to launch a rocket to orbit.

Stoke was founded in 2019 by two Blue Origin veterans: Andy Lapsa, the CEO, and Tom Feldman, the chief technology officer. The company has about 400 employees. Most work at its 168,000-square-foot factory and headquarters in Kent, and about 50 are at its test site in Moses Lake, which is expanding from 75 to 550 acres. About 50 more work at Cape Canaveral.

GeekWire reached out to Stoke Space for comment and we’ll update this story when we hear back.

Japan launches mission to bring home a piece of the Martian moon Phobos

20 October 2026 at 01:59

Japan launched a $578 million mission Monday on a five-year expedition to land on the largest moon of Mars and retrieve samples for return to Earth, a daring international project that could yield new insights into the formation of the Solar System.

The robotic Martian Moons eXploration mission, known as MMX, lifted off at 3:41 pm EDT Monday (4:41 am Japan Standard Time Tuesday) from Tanegashima Space Center in southern Japan.

The MMX spacecraft rode into orbit atop a 207-foot-tall (63-meter) H3 rocket, Japan's flagship launch vehicle. The rocket assigned to MMX debuted a new souped-up configuration with four strap-on solid rocket boosters, full-throttle main engines, and an extended payload shroud to accommodate the demands of Japan's heaviest and most ambitious interplanetary mission to date.

Read full article

Comments

Β© ESA/DLR/FU Berlin/Andrea Luck

A Chinese rocket deorbited over Minnesota and left this in a farmer's cornfield

19 October 2026 at 10:35

About a month ago, a Chinese rocket took off from a remote spaceport in the Gobi Desert, released 10 satellites into orbit, then reignited its engine and put itself on a trajectory to rain down debris over the American Midwest.

The rocket's flight on September 15 lasted between 75 and 80 minutes, and it came down without completing a full orbit of the Earth. Social media posts at the time showed streaks of fiery debris falling from the sky, heading north over Kansas toward Minnesota. The overnight spectacle was also visible on the western horizon from Wisconsin.

The exact time, location, and direction of the debris allowed experts to connect it to the launch of a Zhuque-2E rocket, a medium-lift vehicle built by a Chinese company called LandSpace. The rocket had launched from Dongfeng, a commercial launch zone co-located with the military-run Jiuquan Satellite Launch Center in northwestern China, less than two hours before.

Read full article

Comments

Β© Stevens County Sheriff's Office

Neutron's first launch slips again amid trouble with carbon composites

15 October 2026 at 12:57

Rocket Lab announced Wednesday that its Neutron launch vehicle won't fly until 2027, citing an issue discovered during manufacturing of the rocket's carbon composite structures.

The announcement was public confirmation of what nearly everyone inside Rocket Lab and the wider space industry already knew. The most recent official update from Rocket Lab in August suggested the company still held hope of delivering the first Neutron rocket to its launch pad at Wallops Island, Virginia, before the end of this year, a schedule that would have almost certainly pushed the first flight into 2027.

But Rocket Lab's statement Wednesday about Neutron's schedule suggests the company is still struggling with manufacturing the rocket's large booster stage. Neutron's reusable first stage is made of carbon composite structures, which offer low weight, high strength, and corrosion resistance. But carbon composites in aerospace are generally harder to manufacture than metallic structures.

Read full article

Comments

Β© Rocket Lab

❌
❌