❌

Normal view

There are new articles available, click to refresh the page.
Before yesterdayMain stream

NASA Conducts RS-25 Engine Test in Support of Future Artemis Missions

21 October 2026 at 16:51

2 min read

Preparations for Next Moonwalk Simulations Underway (and Underwater)

RS-25 engine No. 10001 undergoes a hot fire test on the Fred Haise Test Stand at NASA’s Stennis Space Center in Mississippi on October 21, 2026.
NASA conducts a hot fire of RS-25 engine No. 10001 on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, on Oct. 21, 2026.
NASA/Danny Nowlin
RS-25 engine No. 10001 undergoes a hot fire test on the Fred Haise Test Stand at NASA’s Stennis Space Center in Mississippi on October 21, 2026.
NASA conducts a hot fire of RS-25 engine No. 10001 on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, on Oct. 21, 2026.
NASA/Danny Nowlin
RS-25 engine No. 10001 undergoes a hot fire test on the Fred Haise Test Stand at NASA’s Stennis Space Center in Mississippi on October 21, 2026.
NASA conducts a hot fire of RS-25 engine No. 10001 on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, on Oct. 21, 2026.
NASA/Danny Nowlin

NASA tested RS-25 engine No. 10001 on Oct. 21 on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.

Test teams fired the developmental engine for almost eight-and-a-half minutes (500 seconds), the same amount of time RS-25 engines fire during launch of NASA’s SLS (Space Launch System) rocket.

During the test, operators also fired the engine up to the 111% power level, matching the thrust needed for new production engines to launch the SLS rocket and the Orion spacecraft to orbit.

The main objectives of the test were to acceptance test RS-25 flight components for future Artemis missions and validate the new thermal protection system, which protects the RS-25 engine nozzle from the thermal environment surrounding SLS during launch.

While this developmental engine will not be used in flight, the hot fire test provides NASA and NASA’s prime contractor L3Harris Technologies with the capability to capture critical data to improve engine performance and reliability.

Four RS-25 engines produce up to 2 million pounds of combined thrust to help launch the SLS rocket for each Artemis mission.

All RS-25 engines are tested and proven flightworthy at NASA Stennis prior to use. Tests are conducted by a team of operators from NASA, L3Harris, and Nova Space Solutions.

Contractor to Civil Servant: NASA Welcomes Kristie Foster

28 September 2026 at 09:00
Kristie Foster, a quality engineer at NASA’s Stennis Space Center, stands inside the High Pressure Industrial Water Facility in Bay St. Louis, Mississippi, during a photo session on September 10, 2026.
Kristie Foster, quality engineer at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, poses for a photograph inside the High Pressure Industrial Water Facility on Sept. 10, 2026. Foster is now a NASA civil servant at Stennis as part of the administrator’s directive to strengthen technical core competencies within the civil service workforce.
NASA/Danny Nowlin

Kristie Foster paved her road to becoming a NASA civil servant with literal miles of dedication. Her work at the agency’s Stennis Space Center near Bay St. Louis, Mississippi, supports NASA’s mission to return American astronauts to the Moon, build a Moon Base for an enduring presence on the lunar surface, and ensure American leadership in space.

Foster’s move from a long-time contractor to a civil servant secures critical institutional knowledge after being hired in June under the agency’s workforce directive to restore core competencies.

β€œIt means a lot, especially carrying the family legacy forward after my father retired from NASA last year after working about 20 years at Stennis,” said Foster. β€œIt meant something to finally see that dream come true in full circle.”

As a quality engineer, Foster manages quality assurance and engineering at America’s largest rocket propulsion test site with much of her focus at the High Pressure Gas Facility and High Pressure Industrial Water Facility.

Known as the heart of Stennis, the gas facility is where gaseous nitrogen, helium, hydrogen, and air are created, stored, and distributed through a 7-mile pipeline across the center for propulsion testing. The water facility utilizes a 66-million-gallon reservoir to pump massive volumes of water to the test stands for cooling and sound suppression.

She also has taken on a safety role of supporting the build up at the Thad Cochran Test Stand (B-2), where Blue Origin will conduct second stage hot fire testing of the company’s New Glenn rocket.

Her technical work involves reviewing test preparation sheets, verifying operational plans in the field, and ensuring processes are executed from the initial design phase through final closeout.

β€œIf you put safety and quality up front and incorporate it throughout the entire process, you are going to end up with a better product at the end,” said Foster. β€œBecause NASA pushes safety and actively performs it, we are able to work at a fast pace with safety at the forefront.”

Foster applies an adaptable, mission-first mindset to her work that is advancing Artemis missions. Following the successful Artemis II mission last April, Artemis III is intended to demonstrate integrated operations between the Orion spacecraft and test versions of commercial human landing systems before Artemis IV returns astronauts to the lunar surface.

β€œI feel like the space race is back to that original excitement all over again,” said Foster. β€œArtemis I and II were huge, successful missions. That was amazing to be a part of, and it is something to look forward to with Artemis III and IV. I want to see humans back on the Moon. It is exciting.”

While her focus is now on returning humans to the Moon, Foster’s own journey to NASA started close to home. She completed two years at Pearl River Community College, along with summer night classes at Mississippi Gulf Coast Community College.

Her first time working at Stennis came with the largest tenant of the NASA Stennis Federal City: The United States Navy, and an internship with the Naval Oceanographic Office.

While finishing her bachelor’s degree in construction management and land development at Mississippi State University, Foster landed a four-week holiday internship on a Stennis construction project. This evolved into a senior-year schedule of working three days a week at Stennis, then driving hours back to campus to attend classes the other four days.

The hard work paid off with a full-time job. Foster worked as a contractor supporting NASA’s work from 2008 until her recent hire with the agency.

A resident of Poplarville, Mississippi, Foster balances her career with life on a farm. Her 12-year-old son, an avid space enthusiast, now shares similar aerospace conversations with his mother that she once had with her father.

As Foster ensures the safety and quality of NASA’s propulsion testing at Stennis, she is leading by example for her son and the Artemis Generation.

β€œI have always lived by the saying: β€˜Shoot for the Moon, because even if you miss, you land among the stars.’ That is how I have approached my career,” said Foster. β€œIt takes persistence and enjoying what you do. One neat thing about working with NASA at Stennis, especially in the test complex, is that I have never done the same thing twice. It is always an evolving situation.”

Share

Details

Last Updated
Sep 28, 2026
Editor
Bo Black
Location
Stennis Space Center
❌
❌